Home Update : 2025-Aug-11

Floor insulation and sub-floor is 2/3 complete. It’s rather awesome to have some firm footing to work from.

In typical construction, cellulose fibre is blown in, but I’ve been using a rake and a 3 sided plywood box to break up the compressed bundles.

Windows and doors arrived on site late last week.

The sunny, hot, calm weather has been a boon in that I’m not concerned with keeping the insulation dry. The downside is that I can’t work in the afternoon. When I stopped today at 13:00, it was 33° in the shade. As I write this, it is 38° in the shade.

Access to crown land is currently restricted, there is a burn ban and there are a few wildfires in Atlantic Canada.

Leave a Reply

Your email address will not be published. Required fields are marked *