The outer exterior wall framing is complete and the the inner layer has started.

The design is an outer and inner 2×4 stud wall with a gap between them to provide 24 cm space for R35 of cellulose fibre insulation. The gap also means no thermal stud bridging.

I’ve been framing in ~ 2.4 m wall segments to make it easier to push up myself.

A retired contractor had recommended that I cover the floor with house wrap, so when it rains, it will prevent the plywood from delaminating and keep the insulation dry. It also means less time spent covering things up at the end of each day. It will be removed once the walls and roof are closed in. The rigid insulation and expanding foam lining under the cellulose fibre already provides a vapour barrier.

Nothing in Particular – Episode 7

Aired 2025-Aug-19 on CHSR 97.9 FM.

For this week’s [x] Years Later segment, x = 43 and the artist is Wire, with news highlights from the years 1977 and 2020.

Playlist
ArtistSongAlbumYear
Alan ParsonsChomolungmaA Valid Path2004
Darles FlowLost TribesDeep House Essentials: Blue Edition2020
Anne Clark
HomecomingHopeless Cases1987
StarsThe Night Starts HereIn Our Bedroom After the War2007
The BeatlesJuliaWhite Album1968
k.d. lang and the Siss Boom BangThe Waters EdgeSing It Loud2011
MackinawTo the SaltKey Anacon Road1999
WireMannequinPink Flag1977
Eardrum Buzz (12" Version)It's Beginning to and Back Again1989
Primed and ReadyMind Hive2020
Nguyên Lê & Ngo Hong Quang feat. Paolo FresuCloud ChamberHa Noi Duo2017
ContrivedThe VoidAddicted to Saddness2024
Conjure One w/ Jeff MartinPremonitionConjure One2002