Plenty of ‘fun’ today. On my back stapling 0.6 cm galvanized wire mesh (critter proofing) to the underside of the floor joists that are 50 to 75 cm above the ground.

2.5 cm foiled rigid insulation rests on the wire mesh. For added support I’ll be adding wood strapping to the underside at 90 cm intervals. The primary insulation will be about 23 cm of cellulose fiber poured on top for a combined R value of 37.4.



