Home Update : 2025-Jun-30

The well and septic trenches were filled in last week, so after a few days of wet weather, I got back to construction. The rim joists were put into place and when diagonal measurement were taken, they were within a few millimeters. The floor is still square.🎉

Centering and screwing in place of the floor joists to the beams is underway.

Fawn

During the annual highway cleanup for Lower Queensbury, I spotted what might have been another dead animal in the ditch. On closer inspection, it was a living fawn. This was likely from the doe/fawn pair I’d seen in the area. Not knowing if it might be injured, we contacted DNR. A short time later a ranger came by, determined it was unharmed and said that this was relatively common and ‘mom’ would likely be back later.

White-tailed Deer Fawn

Checked back in the evening and it was gone. I’m keeping an eye out for them.